To the left is a tail drive ready to ship after rebuild.





Hey, did you know you can click on these pictures to see bigger photos ?
The cable tray shown to the right was fabricated by P.C.S.F. For Joy Mining's Skyline Face.
To the left a tail drive is loaded for shipment after rebuild.
Pacific Central has a full rebuild division to supply a service to the mining industry.
To the right an American Longwall Cross Frame and Stage Loader are shown after rebuild.
To the right an American Longwall Crusher is loaded for shipment after rebuild.
A compatibility for a shear and pan line was performed by Pacific Central Steel for Joy Mining on a Skyline Face Conveyor..
Cable trays and spills shown to the right were fabricated by Pacific Central Steel for the Skyline face.
The East Carbon Shop was still under construction when Pacific Central performed a full face compatibility for Joy Mining's first full system in the west.
The shop has two 25 ton overhead cranes to meet the needs of handling the large equipment of today's mining operations.
 

 

Hosted by: HTCUtah.com