Pacific Central fabricated the Rail Road Bridge for the bottom dump structure located at East Carbon Landfill.
Hey, did you know you can click on these pictures to see bigger photos ?
Pacific Central Steel fabricated the 10' X 10' box truss for the 850 foot slope conveyer for the West Ridge Mine Site at the East Carbon Shop
The truss sections were assembled with the hardware in the yard and shipped to the mine site.
The discharge and mid section of the conveyor is shown to the right
Pacific Central Steel Fabricated the weigh bin for the truck Load Out to be used at the West Ridge Mine.
The weigh bin was fully assembled in the East Carbon Shop, Using a 36,000 lb. fork lift and one 25 ton crane, the 18' bin was moved out of the shop for loading
 

 

 